Roadmap
Seven milestones, published as they land.
The screen first: everything starts from what reads at six metres.
- M1
Screen pages
Mock-ups at the real resolution and full-scale sheets, to be read from cockpit distance.
- M2
Design
Board and enclosure drawn, ready for the first units.
- M3
Prototypes
Units assembled, readability tests in the sun and through polarised glasses.
- M4
Firmware v1
NMEA 2000 and Signal K reading, pages, standalone countdown, over-the-air updates.
- M5
Environmental tests
Sealing, heat in the sun, UV, vibration; reports published.
- M6
Test season
Ardoise at the foot of the mast, racing.
- M7
First series
Numbered units.